top of page
Atomic second stage poppet installation tool.

The poppet installation tool for the Atomic second stage is used to align the second-stage poppet for proper installation into the second-stage barrel.

 

Place the poppet with the flat side on the small flap with the thin rod of the poppet inside the tool.

Insert the whole assembly into the second stage air barrel making sure the lever is in the upright position, and push the poppet in until it snaps to its correct position.

 

Material: Precision machined from Aluminium.

 

GTIN: 

Atomic second stage poppet installation tool

SKU: 3000-SST-007
€12.00Price
  • Atomic 02-0006-00 Poppet

Related Products

Catalog download button website.jpg

© 2025 D.o.D. all rights res.

Sloetstraat 107 | 6821 CR | Arnhem | The Netherlands   Tel:+31 6 51997943     info@divingondemand.com

We accept following payment methods
  • Facebook
  • Youtube
  • Pinterest
  • Instagram
bottom of page